Church Project Type
September 1, 2003 Completion Date
$1,420,000 Contract Value
Corkill Cush Reeves Architect
|
|
The original Centenary church was totally destroyed by fire in 2000. The newly designed facility is a slab-on-grade structure with asphalt shingle roof, brick and concrete siding exterior. The large bell tower is designed to hold a water storage tank for the sprinkler system. High ceilings and quality woodwork finishes are featured throughout the 10,000 square foot church facility. In spite of the high water table challenge, the project was completed in the Fall of 2003. The facility includes new sanctuary, classrooms, administrative offices, kitchen, cry room, sound and audio/visual control room.
|